GREENFIELD TOWER BUILD

 FRAZER STREET, BRAAMFISCHERVILLE, SOWETO, GAUTENG

July 2025

Installation of a 30m mono lattice tower on a 6 m x 6 m site. Work included site clearance, perimeter fencing, and the provision of power. A post-installation maintenance contract is in place.

Full Soweto towerFull Soweto tower
Soweto Tower
Frazer Street, Braamfischerville
Rebar installationRebar installation
Rebar installation
Excavating foundationExcavating foundation
Excavating site
Shutters placedShutters placed
Shutters placed
Wall and sleevesWall and sleeves
Wall and sleeves
Perimetre fencingPerimetre fencing
Perimetre fencing
Concrete castConcrete cast
Concrete cast
Tower riggingTower rigging
Tower rigging
Tower baseTower base
Tower base
Tower base 1Tower base 1
Base of tower
DB installedDB installed
DB and generator installed
Site internalSite internal
Internal site
Complete towerComplete tower
Complete tower

NEW SITE BUILD

 FAIRLAND SHOPPING CENTRE, WILSON STREET, RANDBURG

MARCH 2024

25m monopole with concrete equipment bunker. Included all civil works, electrification, earthing, security fencing, tower rigging and bunker reticulation. 

Fairlands Shopping Centre towerFairlands Shopping Centre tower
FAIRLAND MONOTOWER
Wilson Street, Randburg
Site kick-offSite kick-off
Site kick-off
Excavation completeExcavation complete
Excavation complete
Rebar installationRebar installation
Rebar installation
Retaining wall 2Retaining wall 2
Retaining wall
Pipes installedPipes installed
Pipes installed
Shutters installedShutters installed
Shutters installed
Bunker installedBunker installed
Bunker installed
Fencing and razor coilFencing and razor coil
Fencing and razor coil
Supply point installedSupply point installed
Supply point installed
DB installedDB installed
DB installed
Tower baseTower base
Tower base
Tower riggedTower rigged
Tower rigged

ROCLA REPAIR - IHS TOWERS

 THEO WASSENAAR SCHOOL, IVES STREET, ROBERTSHAM, JOHANNESBURG SOUTH

May 2025

Rehabilitation of a 30m Rocla concrete mast, including engineering evaluation sign-off and certification.

Rehabilitated IHS towerRehabilitated IHS tower
Rehabilitated IHS tower
Robertsham
BeforeBefore
Before
Before 2Before 2
Before
Before 3Before 3
Before
AfterAfter
After
After 4After 4
After
IHS siteIHS site
IHS site
Before 4Before 4
Before

ROOFTOP BUILD - EAGLE TOWERS

 DA GAMA COURT, CAROLINE STREET, HILLBROW

May 2025

New rooftop site build, including 3 mount poles, guard rails, new ladder access, gantry access from equipment room to poles, electrical connection and site earthing. 

Rooftop build - HillbrowRooftop build - Hillbrow
Rooftop build - Eagle Towers
Caroline Street, Hillbrow
Before 1Before 1
Before
AfterAfter
After
Before 2Before 2
Before
After 2After 2
After
Before 3Before 3
Before
After 3After 3
After
Complete 2Complete 2
3 Mount poles, guardrails3 Mount poles, guardrails
3 Mount poles, guardrails
Electrical connectionsElectrical connections
Electrical connections
DB boardDB board
DB board
Eagle Towers siteEagle Towers site
Eagle Towers site

DECOMMISSIONING - CELL C SITE 1994

 KRUGERSDORP HIGHWAY 

September 2022

Decommissioning of operator equipment off a monopole. Removed all antennas, dishes, feeders and cable. Closed off access points and removed electrical cables and operator meters

Tower for decommissioningTower for decommissioning
Tower for decomissioning
Krugersdorp Highway
Antenna installation - beforeAntenna installation - before
Antenna installation - before
Antenna installation - afterAntenna installation - after
Antenna installation - after
Feeder installation from middle of the tower to the top - beforeFeeder installation from middle of the tower to the top - before
Feeder installation from the middle of the tower to the top - before
FEEDER INSTALLATION FROM MIDDLE OF THE TOWER TO THE TOP - afterFEEDER INSTALLATION FROM MIDDLE OF THE TOWER TO THE TOP - after
Feeder installation from the middle of the tower to the top - after
Feeder installation between the tower and the container - beforeFeeder installation between the tower and the container - before
Feeder installation between the tower and the container - before
Feeder installation between the tower and the container - afterFeeder installation between the tower and the container - after
Feeder installation between the tower and the container - after
Gantry installed - beforeGantry installed - before
Gantry installed - before
Gantry installed - afterGantry installed - after
Gantry installed - after
Container installed - beforeContainer installed - before
Container installed - before
Container installed - afterContainer installed - after
Container installed - after
Transmission cabinet - beforeTransmission cabinet - before
Transmission cabinet - before
Transmission cabinet - afterTransmission cabinet - after
Transmission cabinet - after
Rectifier and battery cabinet - beforeRectifier and battery cabinet - before
Rectifier and battery cabinet - before
Rectifier and battery cabinet - afterRectifier and battery cabinet - after
Rectifier and battery cabinet - after
Triplexors - beforeTriplexors - before
Triplexors - before
Triplexors - afterTriplexors - after